Although smaller than the upcoming Proton, the Toyota/Daihatsu vehicles are expected to compete thanks to clever use of interior space. A transverse mounted Toyota 3SZ-VE 1.5 liter engine powers the front wheels. Interior details such as shifter locations are expected to change for the Malaysian version. Pricing is expected to come in between 1.45 million and 1.8 million yen when the car is introduced to the public on Christmas Day.
Thursday, December 18, 2008
Toyota Passo Sette
Although smaller than the upcoming Proton, the Toyota/Daihatsu vehicles are expected to compete thanks to clever use of interior space. A transverse mounted Toyota 3SZ-VE 1.5 liter engine powers the front wheels. Interior details such as shifter locations are expected to change for the Malaysian version. Pricing is expected to come in between 1.45 million and 1.8 million yen when the car is introduced to the public on Christmas Day.
Labels:
subaru,
Toyota,
Toyota Passo Sette
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment